CDG-CONSTRUCTION LIMITED PORTFOLIO

  • paving in london

    PROJECT: Street Paving

    WHERE: Central London

    CLIENT: A London Council

    KEY REQUIREMENTS: Minimise disruption to public - Complete work quickly and safely

  • new staircase

    PROJECT: New Staircase

    WHERE: Commercial Property - Central London

    CLIENT: Private

    KEY REQUIREMENTS: Initial Design - Formwork Steel and Concrete.

  • attrium dome

    PROJECT: Attrium Dome repairs

    WHERE: Residential Property - Central London

    CLIENT: Private

    KEY REQUIREMENTS: Stabilise and make safe - Working at height - Challenging Safety Issues.

  • brickwork

    PROJECT: Courtyard Renewal

    WHERE: Commercial Property

    CLIENT: Private

    KEY REQUIREMENTS: Design support structure - Minimise disruption to clients - Work safely

  • form structuaL opening

    PROJECT: New Structural Opening

    WHERE: Commercial Property

    CLIENT: Private

    KEY REQUIREMENTS: Careful dismantalling of existing structure - Reinforce and stabilise remaining wall - Attention to detail.

  • drainage in confined area

    PROJECT: Drainage and External Works

    WHERE: Residential Property

    CLIENT: Private

    KEY REQUIREMENTS: Planning and careful operation - Multiple disciplines

  • demolition of mansard roof and lightweight reconstruction

    PROJECT: Demolition and lightweight concrete reconstruction of Mansard Roof

    WHERE: Residential Property

    CLIENT: Private

    KEY REQUIREMENTS: Careful Demolition of existing structure - Minimal Pollution and Disruption during Demolition - Design and construction of new Mansard Roof.

  • Steel frame on sixth floor

    PROJECT: Steel Frame

    WHERE: Public Building - Putney

    CLIENT: Local Authority

    KEY REQUIREMENTS: Structual Design - Logistical Planning - Minimal Disruption - High Quality Welding and Steelworks

  • strip out and installation of structual steel

    PROJECT: Strip out and Installation of Structural Steel

    WHERE: London

    CLIENT: Private

    KEY REQUIREMENTS: Careful Strip Out of Building - Minimal Pollution and Disruption during Strip Out - Design and construction of new Steel Structure

  • structural steel solution for eight floor building

    PROJECT: Structural Steel Solution on ground floor for an Eight floor Building

    WHERE: London

    CLIENT: Private

    KEY REQUIREMENTS: Structural Design - Minimal Disruption to tennents - High Quality Welding and Steelworks

  • finishes to previously formed doorway

    PROJECT: Finishes to Previously formed Opening

    WHERE: Residential Property

    CLIENT: Private

    KEY REQUIREMENTS: Design and construction of new finishes

  • applying designed structural repairs to damaged timber

    PROJECT: Applying Designed Structural repairs to Damaged Timber

    WHERE: Residential Property

    CLIENT: Private

    KEY REQUIREMENTS: Structural Design - High Quality Welding and Steelworks

  • completed restoration to listed timber truss

    PROJECT: Completed Restoration to Listed Timber Truss

    WHERE: London

    CLIENT: Private

    KEY REQUIREMENTS: Careful treatment and restoration - Construction of Protective Fabrication

  • strip out fire damage and install temporary floors

    PROJECT: Strip out Fire Damage and install Temporary Floors

    WHERE: Eight floor Commercial Property

    CLIENT: Private

    KEY REQUIREMENTS: Careful Strip Out in Hazardous Conditions

  • formation of structural steel opening including steel installation

    PROJECT: Formation of Structural Steel opening including Steel Installation

    WHERE: Commercial Property

    CLIENT: Private

    KEY REQUIREMENTS: Precise access construction - Structural Design - High Quality Welding and Steelworks